July 21, 2011

Concrete Work to Take Place on Medical Center Drive Friday, July 22, and Saturday, July 23

Beginning Friday, July 22, at 7:30 p.m., concrete work will be under way at the north VUH entrance at Medical Center Drive. There will be only partial closure of the entrance while this work takes place. Flagmen will be on site to help direct the flow of traffic.

Beginning Saturday, July 23, at 5 a.m., work will resume to remove and replace concrete, all of which should be completed by 2 p.m. While the north entrance into Medical Center Drive is closed, the south exit will be available for patient drop off. Flagmen will continue to be on site to direct vehicle and pedestrian traffic.